Kung Long Lead gel battery with adapter for electron flashlight Horizont Tele-Flash 6V 7Ah
6 V, 7 AhDelivered between Tue, 1.7. and Thu, 14.8.
Supplied by
Product details
Lead gel battery and adapter from fresh production exactly suitable for the battery for the Horizont Tele flash electronic flashlight with adapter only for use in devices built before 11/2005 Technical data, not an original Horizont spare partVoltage 6.0 voltsCapacity 7.0 AhDimensions approx: 116x50x99mmWeight 145 grams.
No right of returnReturn policy