Schneider Electric Acti9 iEM2000 Energy Meter No Display
Nominal voltage2
Product details
Advertisement type: No display
Number of phases: 1
Pulse output: Yes
Depth: 67 mm
Accuracy: ±20 V
Minimum temperature: -20 °C
Series: iEM2000
Acti9 iEM2000 energy meters. The kilowatt-hour meters of the Acti 9 iEM2000 series are designed for measuring active energy consumed by a single-phase electrical circuit. They provide direct measurement up to 40 A without CTs and without auxiliary power supply, resulting in greater savings in wiring. The meter range complies with the standards IEC 61557-12 and IEC 62053-21 (Class 1). The compact size allows for installation in compact switchboards. A pulse output can be used to remotely manage a set of meters. iEM2000T is a single-phase 40-A kilowatt-hour meter without a display, featuring remote transmission of measurement pulses. iEM2010 is a single-phase 40-A kilowatt-hour meter with a display and remote transmission of measurement pulses.
Energy meter type | Energy meter |
Mounting type | Top-hat rail |
Nominal voltage | 276 V |
Maximum current | 40 A |
Item number | 9734618 |
Manufacturer | Schneider Electric |
Category | Energy monitors |
Manufacturer no. | A9MEM2000T |
Release date | 24.9.2018 |
Energy meter type | Energy meter |
Mounting type | Top-hat rail |
Maximum current | 40 A |
Nominal voltage | 276 V |
Display type | Digital |
Tariff execution | Single tariff |
Pulse output | Electrical |
Polar type | 1-phase |
Accuracy class | B |
Protection type (IP code) | IP40 |
Country of origin | China |
Manufacturer commitment | RE100, SBTi |
Manufacturer compensation | According to RE100, the manufacturer Schneider Electric fully compensates for its energy consumption, leading to a reduction in emissions. |
CO₂-Emission | |
Climate contribution |
Height | 95 mm |
Length | 67 mm |
Width | 18 mm |
Weight | 73 g |
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Energy monitors» category have a defect within the first 24 months?
Source: Digitec Galaxus- Schneider ElectricNot enough data
- 1.Orno0.1 %
- 2.Max Hauri0.2 %
- 2.Voltcraft0.2 %
- 4.Qoltec0.3 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- Schneider ElectricNot enough data
- 1.Steffen0 days
- 2.Shelly1 day
- BrennenstuhlNot enough data
- EltakoNot enough data
Return rate
How often is a product of this brand in the «Energy monitors» category returned?
Source: Digitec Galaxus- Schneider ElectricNot enough data
- 1.Orno0 %
- 2.Qoltec0.5 %
- 3.Steffen1 %
- 4.Max Hauri1.4 %