Kung Long Blei Akku RadioMeter Monitor Tosca TCM4
1 pcs., Device specific, 2100 mAh, Battery + chargerDelivered Tue, 22.7.
5 pieces in stock at third-party supplier
5 pieces in stock at third-party supplier
Supplied by
free shipping
Product details
Lead battery suitable for RadioMeter Monitor Tosca TCM4.
12 Volt, 2.1 Ah - approximate dimensions: 180 x 60 x 23 mm - approximate weight: 0.75 kg.
Not original.
Battery size | Device specific |
Items per sales unit | 1 pcs. |
Accumulator type | Battery + charger |
Item number | 20791244 |
Manufacturer | Kung Long |
Category | Battery charger |
Manufacturer no. | AKKP-110700 |
Release date | 5.5.2022 |
Accumulator type | Battery + charger |
Battery type | Lead–acid battery |
Battery size | Device specific |
Voltage | 12 V |
Capacity | 2100 mAh |
Items per sales unit | 1 pcs. |
CO₂-Emission | |
Climate contribution |
Weight | 750 g |
Specifications may include unverified machine translations.
30-day right of return
24 Months Warranty (Bring-in)
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Battery charger» category have a defect within the first 24 months?
Source: Digitec Galaxus- Kung LongNot enough data
- 1.Acconic0 %
- 1.Fenix0 %
- 3.Voltcraft0.1 %
- 4.AccuCell0.2 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- Kung LongNot enough data
- 1.Panasonic0 days
- 1.Varta0 days
- 1.Xtar0 days
- AcconicNot enough data
Return rate
How often is a product of this brand in the «Battery charger» category returned?
Source: Digitec Galaxus- Kung LongNot enough data
- 1.GP Batteries0 %
- 2.Energizer0.6 %
- 2.Panasonic0.6 %
- 4.Fenix0.7 %
Source: Digitec Galaxus