Does a 2nd independent card necessarily require a 2nd charging station?
digitec
8 months ago
0
0
0
Helpful answer
A second independent map for the Dreame A2 robot lawnmower does not necessarily require a second charging station. The robot lawnmower supports multi-area management and dual-fusion mapping, which means it can manage multiple areas with a single charging station.
Automatically generated from the .
Former employee
8 months ago
0
0
0
This allows the robot to connect different maps with each other, even if there is only one starting point. If the second area is completely separated, an additional station would have to be used.