
CHF829.–
Mova 600
600 m², Without boundary wire

Mova 600
600 m², Without boundary wire
Where do you start mapping, in front of the docking station or to the side of it? If to the side, do I have to drive round the charging station at the end before I finish mapping, or can I do it on the other side of the docking station?