Legamaster Magnetic whiteboard project planner, 60 cm x 90 cm
90 x 60 cmMore than 10 pieces in stock at third-party supplier
Product details
Premium annual planner, project planner for 20 people, dimensions 900 x 600 mm. Annual planner in half-year format for up to 20 people or objects. Anodized aluminum frame. Magnetic and dry-erase surface. 30 cm long marker tray. Includes accessory set (board markers, 40 label holders).
The Legamaster Premium annual planner in half-year format is the ideal solution for structured planning of up to 20 people or objects. Thanks to its clear design, you can always keep track of all appointments, projects, or shift schedules. The planner features an anodized aluminum frame and a magnetic, dry-erase surface that can be flexibly written on with board markers and updated at any time. The individual cell size of approximately H 11 x W 4 mm provides ample space for precise entries. A 30 cm long marker tray ensures that pens and accessories are always within reach. The delivery includes a practical accessory set consisting of a set of 4 board markers and 40 label holders with white inserts - perfect for structured labeling of people or projects. Whether for personnel planning, project management, or resource management, this high-quality annual planner supports efficient and professional organization.
Exact colour description | White |
Presentation board type | Annual planner, Personal- & Project Planner |
Item number | 21938141 |
Manufacturer | Legamaster |
Category | Presentation boards |
Manufacturer no. | 7-414000 |
Release date | 1.9.2022 |
Colour | White |
Exact colour description | White |
Material group | Metal |
Material | Aluminium, Steel |
Presentation board type | Annual planner, Personal- & Project Planner |
Presentation board Features | Magnetic, Recordable |
Planning Board Type | Personal- & Project Planner |
Country of origin | Germany, Netherlands |
CO₂ emissions | 30.92 kg |
Climate contribution | CHF 0.74 |
Scope of delivery | 1 piece |
Writing surface format | 90 x 60 cm |
Wide writing surface | 90 cm |
Writing surface height | 60 cm |
Max. elevation | 60 cm |
Weight | 6750 g |
Length | 102 cm |
Width | 70 cm |
Height | 5 cm |
Weight | 6.50 kg |
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Presentation boards» category have a defect within the first 24 months?
Source: Digitec Galaxus- 10.Office Marshal0.8 %
- 12.Genie0.9 %
- 13.Legamaster1 %
- 14.Relaxdays1.1 %
- 15.Franken1.2 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- LegamasterNot enough data
- 1.Bi-Office0 days
- 1.Franken0 days
- 1.Magnetoplan0 days
- 1.Nobo0 days
Return rate
How often is a product of this brand in the «Presentation boards» category returned?
Source: Digitec Galaxus- 3.Bic0.9 %
- 4.Herlitz1 %
- 5.Legamaster1.2 %
- 6.Nobo1.3 %
- 6.Office1.3 %