Wesco Evm 25-55
Substructure hoodProduct details
The EVM 25-55 canopy hood is a versatile under-cabinet hood suitable for both exhaust and recirculation operation. With a width of 55 cm, it seamlessly integrates into various kitchen layouts and provides an effective solution for reducing cooking vapors and odors. The hood is made of sturdy metal and is finished in an elegant anthracite color, giving it a modern and contemporary appearance. It features three power levels that allow for flexible adjustment to different cooking needs. The EVM 25-55 is not only functional but also energy-efficient, with a classification of C according to 2020 standards. This range hood is a practical addition to any kitchen that values design and efficiency.
- Suitable for exhaust and recirculation operation
- Three power levels for individual adjustment
- Energy efficiency class C
- Sturdy metal construction.
Energy efficiency class 2020 | B |
Width | 55 cm |
Depth | 30 cm |
Item number | 8805770 |
Manufacturer | Wesco |
Category | Extractor hoods |
Manufacturer no. | 95263220 |
Release date | 27.5.2018 |
Colour | Grey |
Exact colour description | Charcoal |
Material group | Metal |
Material | Metal |
Standard | CH standard 55cm |
Design | Installation |
Extractor hood type | Substructure hood |
mode of operation | Circulating air, Outgoing air |
Number of power levels | 3x |
type of filter | Metal filters |
Energy efficiency class 2020 | B |
CO₂ emissions | 91.2 kg |
Climate contribution | CHF 2.16 |
Width | 55 cm |
Depth | 30 cm |
Weight | 11 kg |
Length | 72.20 cm |
Width | 32 cm |
Height | 37 cm |
Weight | 13.87 kg |
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Extractor hoods» category have a defect within the first 24 months?
Source: Digitec Galaxus- WescoNot enough data
- 1.Bosch Hausgeräte0.9 %
- 1.Electrolux0.9 %
- 1.Siemens0.9 %
- 4.Bomann1.3 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- WescoNot enough data
- 1.Electrolux0 days
- BomannNot enough data
- Bosch HausgeräteNot enough data
- SiemensNot enough data
Return rate
How often is a product of this brand in the «Extractor hoods» category returned?
Source: Digitec Galaxus- WescoNot enough data
- 1.Bomann0.5 %
- 2.Bosch Hausgeräte4.1 %
- 2.Electrolux4.1 %
- 4.Siemens5.9 %